Date de publication: 27 juin 2006
Promoteur – Intermédiaire Financier
The Promoters will be the three Power Utility companies : EPRS (Elektroprivreda Republike Srpske), EPBiH (Elektroprivreda Bosnia Herzegovina), and EPHZHB (Elektroprivreda of the Croatian Community of Herzeg-Bosnia), and ISO, the Independent System Operator.Lieu
Description
The project mainly consists of the rehabilitation and upgrading of the Bosnian power distribution system, renovation of several hydropower plants, under the country’s "Power IV" programme.
Objectifs
The reduction of losses in the power system, and improved energy efficiency, will reduce operational costs and increase the quality and reliability of power supply as well as improving safety. These benefits are expected to make a substantial contribution to the on-going economic recovery.
Commentaires
Electricity.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 93 million.
Coût total (montant approximatif)
EUR 200.7 million.
Aspects environnementaux
The Bank’s services will take care to ensure that proper attention is given to all environmental concerns and that appropriate mitigation measures are implemented, in line with the Bank’s relevant guidelines.
Passation des marchés
The promoters is aware of the Bank procedures regarding procurement. Procurement procedures will be checked for consistency with the Bank’s guidelines and the relevant applicable European Union rules.
Statut
Signé - 8/01/2007
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).