Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20050359
Date de publication: 31 janvier 2007

Promoteur – Intermédiaire Financier

The Portuguese state (Ministry of Health).

Lieu

Description

30-year DBFM (design, build, finance, maintain) project finance concession for the construction and operation of a new hospital in the area of Braga.

Objectifs

The new hospital will serve the Braga and Viana do Castelo areas of the Northern Region of Portugal, with a local catchment population of around 300 000 and a reference catchment population of up to 1 million in some specialities. It will replace the existing São Marcos Hospital, which consists of a number of buildings in the centre of Braga, as well as a psychiatric department located some 3km away.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to 50% of the project cost.

Coût total (montant approximatif)

To be evaluated.

Aspects environnementaux

Compliance with EU environmental directives and national laws will be ensured.

Passation des marchés

The project has been advertised in the Official Journal of the EU in September 2004 in accordance with relevant EU procurement legislation (Directive 93/38/EEC).

Statut

Signé - 3/06/2009

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Portugal Santé