Date de publication: 27 juillet 2006
Promoteur – Intermédiaire Financier
ONEP (Office National de l’Eau Potable)Lieu
Description
The project is for financing wastewater collection and treatment infrastructure for municipalities in the Sebou basin in particular, covering an area of 40 000 km2, with a population of around 6 million.
Objectifs
The project fits in with the objectives of the National Programme for Wastewater and Sewage Treatment, under which more than 80% of the urban population is to be connected to the mains drainage network and pollution is to be reduced by at least 60%. In this context ONEP has identified a priority programme of 111 centres affecting 3.7 million of Morocco’s inhabitants (12% of the population).
Commentaires
Environment.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 40 million.
Coût total (montant approximatif)
Approximately EUR 90 million.
Aspects environnementaux
The capital expenditure programme will have the result of:
- significantly reducing the pollution caused by wastewater infiltration of watercourses;
- protecting groundwater from water pollution;
- combating the risks of eutrophication of the sea;
- improving the landscape of the towns concerned;
- preserving the quality of surface water and groundwater.
It should be noted that certain components of the project are covered by the conditions of Annex II to Directive 97/11/EC on environmental impact assessments and may be the subject of such an assessment.
Passation des marchés
The various project components financed by the Bank will be the subject of public invitations to tender in accordance with the Bank's Guide to Procurement.
The international invitations to tender will be published in the OJ.
Statut
Signé - 14/12/2006
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).