Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20050017
Date de publication: 21 septembre 2005

Lieu

Description

Replacement of an existing combined heat and power plant (TEC-2) in Riga, Latvia (Objective 1 Area). The installation comprises a gas-fired combined cycle unit, heat recovery steam generator and steam turbine with an anticipated net power output of approximately 400 MWe.

Objectifs

To raise the reliability and efficiency of energy supply in Latvia, and meeting environmental policy objectives.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 40 million. The EIB has submitted its financing proposal for EUR 40 million in July 2005 to Latvenergo following a public procurement tender. Latvenergo is expected to publish the results of the tender by year-end 2005.

Coût total (montant approximatif)

Approximately EUR 200 million.

Aspects environnementaux

The project will be located in a lightly inhabited industrial area east of the city on the site of the existing plant. Environmental Impact Assessment (EIA) was conducted in line with EU Directives and national law.

Passation des marchés

Procurement procedures are in compliance with relevant EU directives and national and regional legislation.

Statut

Signé - 15/12/2005

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Lettonie Énergie