Date de publication: 28 avril 2005
Promoteur – Intermédiaire Financier
Ministry of Transport and Communication, Road DirectorateLieu
Description
Construction of a 29 km long 4-lane motorway between Banja Luka, the capital of Republika Srpska, and Corridor X, including a bridge over river Sava.
Objectifs
Improvement of national and regional transport links with neighbouring countries, reduction of traffic congestion, alleviation of air and noise pollution on the existing road, and better prospects for the residential, industrial and commercial development in the region.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 65 million.
Coût total (montant approximatif)
Up to EUR 130 million.
Aspects environnementaux
Designs for the construction of a new motorway will ensure that proper attention is given to all environmental concerns in line with the Bank’s guidelines.
Passation des marchés
Procurement procedures will be on the basis of international competitive bidding in line with the Bank’s guidelines.
Statut
Signé - 17/11/2005