Extension of existing power generation capacity in Madeira and Porto Santo (37 MWe through dual fuel generators and 5 MWe in an existing hydro-electric facility) and upgrading of the archipelago’s transmission and distribution networks.
Objectifs
Increase in power generation capacity and upgrade of transmission and distribution grids.
Commentaires
Electrical energy.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 70m indicatively.
Coût total (montant approximatif)
EUR 190m indicatively.
Aspects environnementaux
To be assessed.
Passation des marchés
To be assessed.
Statut
Signé - 3/05/2005