Date de publication: 3 septembre 2004
Promoteur – Intermédiaire Financier
Territorio Historico de Alava through Vias de Alava, SA and Territoria Historico de Guipuzcoa through BIDEGI, SA.Lieu
Description
The project consists of the construction of a 45 km toll motorway connecting the cities of Eibar and Vitoria (around 30km in Guipuzcoa and 15 km in Alava).
Objectifs
The project represents a substantial reinforcement in a congested section of the transport corridor between Portugal and France.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to 50% of the total project cost.
Coût total (montant approximatif)
Around EUR 900 million.
Aspects environnementaux
Compliance with EU environmental directives and national laws shall be ensured.
Passation des marchés
Compliance with EU Directives shall be ensured.
Statut
Signé - 4/05/2007
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).