Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20030259
    Date de publication: 17 février 2004

    Promoteur – Intermédiaire Financier

    Athens Concert Hall Organisation (OMMA)
    Contact: Mr Manolopoulos

    Lieu

    Description

    The proposed project consists of the study, design, construction and equipping of a number of multi-purpose halls with associated service spaces, a banqueting hall with associated service and foyer spaces, a Music Library, congress and commercial facilities, underground parking as well as appropriate technical, sound and light equipment for venues of such nature. Adaptations and additions to the current building are also included in the project to ensure its integration to the new construction. The project includes an underground link with the near-by Metro station thus ensuring safe access to the public transport network.

    Objectifs

    The Athens Concert Hall is a modern cultural and educational point of reference to the Athens metropolitan area. The extension of the current Concert Hall by the project under consideration will offer a unique asset in line with metropolitan Athens’ rich cultural heritage. The project also includes the underground link of the Athens Concert Hall with the nearby station of the Athens Metro, which in essence will lead to substantial time savings for visitors and spectators and significantly reduce the use of private car/taxi alternatives which continuously contributes to major traffic problems in the area.

    Commentaires

    Regional Development and improvement of the Urban Environment and Human Capital.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 150 m.

    Coût total (montant approximatif)

    Estimated at EUR 300 m.

    Aspects environnementaux

    The Bank requires of the Promoter to fully comply will all relevant EU legislation in the field of the environment.

    Passation des marchés

    The Bank requires of the Promoter to fully comply with the provisions of the relevant EU procurement legislation.

    Statut

    Signé - 29/12/2003

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Services