    Référence: 20030178
    Date de publication: 20 octobre 2003

    Promoteur – Intermédiaire Financier

    Serbian Road Directorate (SRD) and Montenegrin Ministry of Maritime Affairs and Transport (MAT).

    Description

    The proposed project includes two schemes:

    • The rehabilitation of the existing carriageway between Belgrade and Novi Sad (Pan European Corridor X) as well as the construction of a new carriageway on the same section including the bridge Beska over the Danube. The increasing traffic on the road axis between Belgrade and the Hungarian border has created congestion on the section Belgrade-Novi Sad where a very high level of traffic is registered.
    • Upgrading of the E65 road section between Podgorica and Bar (Adriatic coast). The construction of the Sozina Tunnel -already started by the Montenegrin Government- will be completed by new access roads.

    Objectifs

    The selected investments will contribute to modernise the existing regional road connections with substantial time savings and improved safety.

    Commentaires

    Roads rehabilitation and upgrading.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Approximately EUR 50 million.

    Coût total (montant approximatif)

    Approximately EUR 115 million.

    Aspects environnementaux

    For both elements of the project full EIA procedures will need to be followed and will be assessed during appraisal. For Belgrade Novi-Sad, it can be expected that no significant impacts will occur in the widening of an existing transport corridor. For the Podgorica Bar road, there is a protected environmental area next to the project. Appropriate measures to be undertaken in this area will be evaluated and suggested to the promoter.

    Passation des marchés

    EIB procedures for international procurement would be applied, where relevant.

    Statut

    Signé - 17/05/2004

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Transports