Date de publication: 28 septembre 2004
Promoteur – Intermédiaire Financier
SPV in charge of implementing first the feasibility study and possibly at a later stage, the industrial project: “El Aouj S.A.”, Mauritanian subsidiary of “Sphere Investments Limited” (Australia).Lieu
Description
Financing of a bankable feasibility study (BFS) on the exploitation of the Guelb el Aouj iron ore deposit, located 35 km from SNIM’s existing mining operations.
Objectifs
The BFS should enable the promoter or any other investor to decide whether it is worth proceeding with the establishment of a new iron ore mine and subsequent processing infrastructure designed to produce DR (Direct Reduction) grade pellets possibly destined to the DR markets in North Africa and the Middle East.
Commentaires
Mining and Quarrying.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Maximum EUR 5m from Investment Facility Resources, to be financed under the EUR 30m IF global authorisation approved in December 2003.
Coût total (montant approximatif)
USD 11m.
Aspects environnementaux
An environmental impact study, including a management plan on environmental aspects and a preliminary closing plan will be part of the feasibility study. Considering the location and not very harmful techniques of the project, no major problem is foreseen.
Passation des marchés
The various components of the study which are for the most part specialized in nature as well as the preparation of the final report will be contracted out in direct negotiations.
Statut
Signé - 10/02/2005
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).