Date de publication: 24 janvier 2006
Promoteur – Intermédiaire Financier
A consortium to be selected through a public internationaltender.Lieu
Description
A shadow toll road scheme to be procured on a DBFO basis (design, build, operate and finance). It will cover 94 km of road including c. 48 km of new road, the balance consisting of refurbishments.
Objectifs
Through improving road standards and increasing road capacity, the project will improve flows of passenger and freight traffic. Immediate benefits will be reductions in travel time and in vehicle operating costs, as well as improvements in traffic safety.
Commentaires
Road transport.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to 50% of total project cost.
Coût total (montant approximatif)
Estimated in the range of EUR 300-350m.
Aspects environnementaux
Compliance with EU environmental directives and national laws will be ensured.
Passation des marchés
The project has been advertised in the Official Journal of the EU in accordance with EU Directive 93/37/EEC.
Statut
Signé - 17/12/2007
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).