Référence: 20020264
Date de publication: 7 novembre 2006

Promoteur – Intermédiaire Financier

Union Fenosa Distribución, SA and dependent group companies engaged in electricity distribution activities; or Acceptable bank(s) in case of bank(s) intermediation.

Lieu

Description

Reinforcement and extension of the electricity sub transmission and distribution network in 4 Spanish regions. The project comprises a large number of geographically dispersed schemes on the promoter’s distribution networks (220 KV to low tension). The project is part of the promoter’s 2006-2008 ongoing capital spending programme in electricity distribution facilities and includes the study, design, supply, erection and commissioning of substations, overhead lines, underground cables, meters, as well as improvements of regional network operation and control centres.

Objectifs

The project will increase capacity to cater for growing electricity demand, improve the quality and reliability of supply, reduce technical losses and fulfil legal and regulatory requirements.

Commentaires

Electricity distribution.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to 38% of project cost.

Coût total (montant approximatif)

Approximately EUR 706 million.

Aspects environnementaux

A small portion of schemes fall under Annex I and Annex II of the EU Environmental Directive and is subject to Environmental Impact Assessment. The promoter submits the investment proposals on a regular basis to the competent authorities.

Passation des marchés

The investments are subject to Procurement Directive 2004/17/EC. The promoter has confirmed that procurement procedures applied to the project will be in line with the directive’s requirements, including regular publications in the Official Journal of the EU and the National Official Journal (BOE).

Statut

Signé - 28/02/2007

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Énergie