Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20020051
    Date de publication: 6 octobre 2002

    Promoteur – Intermédiaire Financier

    Aarhus Kommune

    Lieu

    Description

    Construction of a new municipal waste incineration line and implementation of a number of drinking water supply and waste water treatment schemes in the municipality of Aarhus.

    Objectifs

    Implementation of this project will contribute to improved solid waste management, water and sanitation services, air quality improvement, rational use of energy through the combined production of heat and electricity as well as ensuring compliance with EU and national environmental policies.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 100 millions, equivalent to approximately DKK 743 millions

    Coût total (montant approximatif)

    EUR 200 millions

    Aspects environnementaux

    The municipal waste incineration plant will enhance energy recovery from the combustion process of the waste by producing both electricity for sale to the public grid and heat for district heating. This will contribute to reducing primary energy consumption and related atmospheric pollution. The new incineration plant will be equipped with a flue gas cleaning system designed to keep emissions below national and EU requirements, whereas the flue gas cleaning equipment of the three existing lines will be upgraded. The CHP incineration plant is part of a larger municipal incineration complex in which it constitutes a replacement and expansion of existing lines.

    The water and sanitation investments will ensure the promoter's compliance with Danish water legislation in line with EU Directive 98/83 et al., and improve effluent treatment for an estimated 220,000 population equivalent.

    Passation des marchés

    EIB procurement rules will pertain.

    Statut

    Signé - 28/06/2005

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Danemark Eau, assainissement Déchets solides