Recherche Fr menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20020008
Date de publication: 5 juillet 2002

Promoteur – Intermédiaire Financier

Hrvatske Autoceste d.o.o. (Croatian Motorways Ltd.) - CML

Lieu

Description

Rehabilitation of 418 km of existing motorways in Croatia, most of them on the Pan European Corridors X and Xa.

Objectifs

The Croatian Government has recently decided to accelerate the construction and the rehabilitation of motorways throughout the country.

Commentaires

Roads

Secteur(s)

Montant BEI envisagé (montant approximatif)

Approximately EUR 70 million

Coût total (montant approximatif)

N/A

Aspects environnementaux

The project will have considerable impact on the environment, and the implications of this both on a formal and a substantive level will have to be carefully verified.In accordance with its normal procedures, the Bank will ensure that appropriate measures (including EIAs similar in practice to those required by EU law) will be taken with respect to environmental protection and that any possible negative impact will be studied and appropriate mitigating measures taken in good time.

Passation des marchés

EIB procedures for international procurement would be applied, where applicable.

Statut

Signé - 13/12/2002

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Croatie Transports