Date de publication: 22 mars 2002
Promoteur – Intermédiaire Financier
Scottish and Southern Energy
Inveralmond House
200 Dunkeld Road
Perth
Perthshire PH1 3HQ
Contact point: G. Alexander
Lieu
Description
The project comprises the refurbishment and upgrade of several small and medium-scale hydro-electric plants and the installation of several wind farms in various locations in Scotland, with a combined capacity of up to approximately 540 MWe. The plants are expected to be commissioned in the period 2002-2006.
Objectifs
The refurbishment and development of renewable energy capacity, using indigenous sources of energy, will support UK and European targets for renewable energy generation and abatement of CO2 emissions.
Commentaires
Electricity
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to GBP 100 mio
Coût total (montant approximatif)
Estimated to be in the region of GBP 300m for the period 2002-2006
Aspects environnementaux
The schemes included in the project fall under Annex II of Directive 97/11/EC. Environmental Impact Assessment (EIA) procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate. The promoter operates in accordance with an environmental management plan certified to ISO 14001.
Passation des marchés
Contracts for wind farm construction and refurbishment of hydro-electric plants are tendered on a competitive basis following pre-qualification of contractors, with notices placed in the Official Journal of the European Communities as appropriate.
Statut
Signé - 24/06/2002
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).