    Référence: 20010405
    Date de publication: 19 décembre 2002

    Promoteur – Intermédiaire Financier

    Slovak Guarantee and Development Bank (SGDB)

    Lieu

    Description

    The project concerns the design, supervision and construction of priority investment schemes in water supply and wastewater collection and treatment throughout Slovakia to meet requirements of EU Directives and to be co-financed with ISPA. Schemes are prepared by final beneficiaries, municipalities and/or their utility companies and/or water companies, and are selected according to predefined eligibility criteria. The operation will be structured as a framework loan and intermediated through the Slovak Guarantee and Development Bank (SGDB), a publicly owned development bank.

    Objectifs

    The project's objectives are twofold: (i) increased customer service standards and public health, as a result of improved water supply reliability, drinking water quality, and sewerage connections; and (ii) pollution reduction through cleaner water effluents flowing into the Danube and other watersheds.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Estimated at EUR 30 million.

    Coût total (montant approximatif)

    About EUR 120 million

    Aspects environnementaux

    By their nature, the schemes are generally environmentally beneficial. Benefits include reduction of pollution by the construction of new or upgraded wastewater treatment plants, reduction of sewer flooding by increasing conveyance capacity, and provision of first time sewerage. Water supply investments are to improve quality and reliability for public health reasons.Improvements of water supply and sewage collection, treatment and disposal represent essential steps towards ultimate compliance with the relevant EU legislation. Approval procedures require preparation of an environmental assessment of the project and a full EIA where required by EU Directives. None of the schemes currently in the project pipeline is expected to require a full EIA in accordance with Directive 97/11/EC.

    Passation des marchés

    The works contracts will be procured in-line with EU Procurement Directives.

    Statut

    Signé - 18/11/2002

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovaquie Lignes de crédit