Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20000282
Date de publication: 27 novembre 2002

Promoteur – Intermédiaire Financier

Przedsiebiorstwo Panstwowe “Porty Lotnicze” (PPL), or “Polish Airports” State Enterprise.

Lieu

Description

Construction of a second terminal at Warsaw International Airport.

Objectifs

The project will enable the airport to accommodate existing and rapidly rising demand for air transport in Poland, and will contribute to Poland's integration into the EU, and to strengthening transport links between the EU and Poland.

Commentaires

Air transport

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 200 million

Aspects environnementaux

An independent Environmental Impact Study (EIS) has been undertaken based upon outline plans. The project will comply with the Polish Environmental Protection Act of 27 April 2001 and a full EIA, compliant with both Polish and EU legislation, will be completed at detailed design stage.

Passation des marchés

The procurement process for the design and build contract comprised an open international tender competition between pre-qualified consortia, following advertisement in OJEC.

Statut

Signé - 19/12/2002

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Transports