Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Fiche récapitulative

Date de publication
11 mars 2026
Statut
Référence
À l'examen | 22/05/2025
20240513
Nom du projet
Promoteur – Intermédiaire financier
NORTH TERMINAL VALENCIA PORT
AUTORIDAD PORTUARIA DE VALENCIA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 299 million
EUR 597 million
Lieu
Secteur(s)
Description
Objectifs

The project concerns the construction of the necessary infrastructure for an automated and fully electrified container terminal within the northern expansion of the Port of Valencia (Spain). The expansion was previously financed by the EIB (operation no. 2008-0016). The new terminal will increase the port's capacity in response to traffic growth. Designed to handle the world's largest container vessels, the terminal will also feature a dedicated intermodal rail facility. Infrastructure works comprise the construction of a main quay wall approximately 2 km long, around 700 m of ancillary quays, reclamation of 137 hectares of land, deepening of the port basin, and the full dismantling of both the North secondary breakwater and of the cruise terminal existing within the project area. Investments related to terminal paving, buildings, handling and operation equipment, and the rail terminal will be carried out by the future concessionaire and are not part of the project.

The aim is to support the development of the Trans-European Transport Network (TEN-T) network by increasing the capacity of a core TEN-T port with rail connection. The Project is expected to improve the efficiency and environmental performance of the maritime supply chain, therefore enhancing the resilience and sustainability of the European transport system.

Aspects environnementaux
Passation des marchés

The Environmental Impact Assessments (EIA) procedures for the northern expansion of the Port of Valencia, including the container terminal, were completed on 30 July 2007 with the issuing of the EIA decision (DIA) by the relevant competent authority, the Ministry for Environment, in accordance with the EIA Directive in force at the time. The DIA covers the entire expansion project including dredging, construction works and the subsequent port operations. The validity of the DIA has been extended. The EIB Project is different from the one considered in the DIA, and the changes include among others a different layout of the container terminal. The Promoter assessed the changes against the criteria laid down in the national legislation to determine the need for a simplified environmental impact assessment. It concluded that the Project was expected to have no additional significant impacts on the environment compared to those identified for the initial project in the EIA of 2007 and decided that no new EIA procedures were required. Works on the Project started in Q4 2024. The Project area is located approximately 4 km north of the Natura 2000 sites l'Albufera (SPA), ES0000471 and l'Albufera (SAC), ES0000023. The requirements of the applicable legislation, mainly the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, the Water Framework Directive 2000/60/EC, the Marine Strategy Framework Directive 2008/56/EC as amended by Directive 2017/845/EU, and the Habitats and Birds Directives (92/43/EEC and 2009/147/EC, respectively), will be checked during the appraisal.

The Bank will require the Promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Procurement notice for the Works contract of the Project was published in the EU Official Journal on 28/12/2023 (reference no. OJ S 250/2023). The contract was awarded to a Spanish-Belgian joint venture comprising the firms Acciona Construcción SA, Jan De Nul NV and Grupo Bertolín SAU (Official Journal reference no. OJ S 194/2024, published on 04/10/2024). Procurement notice for the supervision contract of the Project was published in the EU Official Journal on 22/05/2024 (reference no. OJ S 98/2024). The contract was awarded to a joint venture comprising the Spanish firms CPS Infraestructuras, Movilidad y Medio Ambiente SL and Intercontrol Levante SA (Official Journal reference no. OJ S 243/2024, published on 13/12/2024). The Project will be operated by the Swiss private operator Terminal Investment Limited SARL (TiL) under a concession agreement awarded in 2019 (procurement notice published in the EU Official Journal on 11/12/2018, reference no. OJ S 238/2018).

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes