Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
175 000 000 €
Pays
Secteur(s)
Portugal : 175 000 000 €
Énergie : 175 000 000 €
Date(s) de signature
14/01/2026 : 175 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
22 janvier 2026
Statut
Référence
Signé | 14/01/2026
20240332
Nom du projet
Promoteur – Intermédiaire financier
IBERDROLA TAMEGA WIND HYBRIDISATION GREEN LOAN
COMPANIA ESPANOLA DE SEGUROS DE CREDITO A LA EXPORTACION SA COMPANIA D,IBERDROLA SA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 175 million
EUR 347 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The project concerns the construction and operation of two wind farms in northern Portugal, with a total installed capacity of 274 MW.

The wind farms will use 7.2 MW wind turbines and will be connected to the existing substations of the Tâmega hydropower plant (also financed by the EIB) through two dedicated 400 kV transmission lines of approximately 8 km and 3 km, respectively.

Additionality and Impact

The Project concerns the development and operation of a portfolio of wind farms in Portugal. It will support the 2030 targets set out in the National Energy and Climate Plan and the REPowerEU action plan.


The financing of this Project also contributes to the Bank's lending priority objectives on Energy (Renewable Energy), Environmental Sustainability and Climate Action (transversal) as well as Social and Economic Cohesion.


As the Project will produce electricity from low carbon sources, it will address the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation).


It is expected that the Project will rely on revenues from (i) commercial power purchase agreements ("cPPAs") and (ii) the wholesale market, therefore it is expected to improve market efficiency and competition.


On Project quality, the level of the Promoter's governance and risk management capability after mitigation measures is deemed very good. The Project is expected to have an excellent economic return, considering the economic value of the electricity generated.


The EIB's financing provides an additional source of funding to the Promoter. The Bank's financial contribution is considered very good and valuable to the client, as the EIB's offering is more favourable than market alternatives and the "EIB Green Loan" label is deemed as a stamp of quality on the Promoter's investments.

Aspects environnementaux
Passation des marchés

Windfarms falls under Annex II of Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which the Member States shall determine, based on defined criteria, whether the project shall be subject to a mandatory EIA, including public consultation. Due to their technical characteristics (length), the 400kV overhead transmission lines needed for the connection of the projects to the grid, also fall under Annex II of the EIA Directive. The Project consists of two wind farms, north and south of the TAMEGA hydro power plant respectively. The Southern wind farm entails 7 wind turbines in the border and marginally within the Natura 2000 site Alvão Marão (PTCON0003) and IBA Serra do Alvão e Marão. A single EIA process covering both sites/WFs and their ancillary infrastructure has been completed, and the relevant environmental approval was granted. The approval includes several sets of measures to be implemented by the promoter and comprehensive biodiversity monitoring requirements. The requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified during appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, pollution prevention and control.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the promoter to apply those rules.

Milestone
À l'examen
Approuvé
Signé
3 septembre 2025
14 janvier 2026
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - IBERDROLA TAMEGA WIND HYBRIDISATION GREEN LOAN
Date de publication
24 Jan 2026
Langue
Sujet général
Prêts
Numéro du document
234546588
Thématique du document
Information Environnementale
Numéro du projet
20240332
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes