Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
500 000 000 €
Pays
Secteur(s)
Allemagne : 499 999 999,99 €
Lignes de crédit : 500 000 000 €
Date(s) de signature
31/07/2024 : 0,01 €
31/07/2024 : 499 999 999,99 €
Lien vers la source

Fiche récapitulative

Date de publication
31 juillet 2024
Statut
Référence
Signé | 31/07/2024
20230824
Nom du projet
Promoteur – Intermédiaire financier
DEUTSCHE BANK PAN-EU WIND POWER PACKAGE RS
DEUTSCHE BANK AG
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 500 million
EUR 8000 million
Lieu
Secteur(s)
Description
Objectifs

The project consists of an underlying operation with Deutsche Bank under the PAN-EU WIND POWER PACKAGE RISK SHARING Lending Envelope. The operation, an unfunded partial delegation linked risk sharing (LRS) transaction, will enable the intermediary to provide counter-guarantees on advance payments and performance bonds associated with supply contracts of EU Original Equipment Manufacturers (OEMs) of wind energy equipment and the related wind value chain components (e.g. turbines, grid connection's infrastructure, cables, transformer stations, sub-stations and possibly sub-contractors).

The aim is to finance new investments in the wind energy sector across the EU. The PAN-EU WIND POWER PACKAGE RISK SHARING Lending Envelope is a dedicated Guarantee Programme to allow banks to provide additional guarantees related to supply contracts of wind energy equipment manufacturers in the EU, which is expected to mobilise about €1bn of advance payment and performance guarantees related to EU based wind power equipment manufacturers' production activities for new wind energy infrastructure in the EU. The sub-operations will be limited to manufacturing companies producing and/or assembling in the EU and supplying wind farms and related value chain components to be used in wind energy projects in the EU.

Additionality and Impact

The operation will contribute to the developing of the energy sector.


The ambitious policy decarbonisation targets set for 2030 require significant investment in renewable energy production capacity, notably in onshore and offshore wind energy infrastructure in Europe. This in turn requires a scale up of the supply chain manufacturing industry and ability to deliver components, services, and materials in a timely manner. It also requires an increased access to advance payment and performance guarantee lines for the OEMs, in a context of financial pressure (growing order books and challenges from rising inflation and interest rates) and with commercial banks reaching their exposure concentration limits vis-a-vis OEMs. The current situation in the guarantee market for wind projects is exacerbated by the relatively limited number of EU commercial banks providing such demanded guarantees in Europe.


The operation, by specifically addressing the increasing bottleneck associated with the provision of guarantees to OEMs, will enable the activation of under-utilised already installed strategic Net-Zero technology manufacturing capacity of wind energy OEM suppliers in Europe, which would otherwise go idle and potentially be lost in part. This enabling effect will help support the proper functioning and access to finance of the entire wind-energy supply chain and will, in turn, contribute to deploy additional renewable energy generation capacity that will eventually be installed in Europe.

Aspects environnementaux
Passation des marchés

Sub-projects need to comply with the EU acquis, in particular in the field of environment, the EIB will require the intermediary institution to take all the requisite measures to ensure that the environment procedures carried out by the Final Recipients under the New Portfolio will comply with the relevant EU environment, social and procurement legislation and the applicable national legislation, provided that it is in conformity with EU rules.

Sub-projects need to comply with the EU acquis and the EIB will require the intermediary institution to take all the requisite measures to ensure that procurement procedures carried out by the Final Recipients under the new portfolio will comply with the relevant EU procurement legislation and the applicable national legislation, provided that it is in conformity with EU rules.

Milestone
À l'examen
Approuvé
Signé
12 avril 2024
31 juillet 2024
Projets associés
Lien vers la source
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes