Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    105 000 000 €
    Pays
    Secteur(s)
    Finlande : 105 000 000 €
    Éducation : 105 000 000 €
    Date(s) de signature
    20/11/2024 : 105 000 000 €

    Fiche récapitulative

    Date de publication
    3 juin 2024
    Statut
    Référence
    Signé | 20/11/2024
    20230578
    Nom du projet
    Promoteur – Intermédiaire financier
    TUUSULA EDUCATION INFRASTRUCTURE
    MUNICIPALITY OF TUUSULA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 105 million
    EUR 164 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project will finance the modernisation and adaptation of school infrastructure in both early childhood education and care and basic education. In particular, it concerns investments in three new campuses (Riihikallio, Rykmentinpuisto, Lahela) for pre-primary, primary and secondary education. A good level and quality of education accessible to all is essential for the economic, social and intellectual development of a country. Given the economic and social consequences of the global health crisis, the role of education is even more important to improve the living conditions and economic and social opportunities of young people. Following the new national curriculum introduced in 2016, Finland has been undergoing one of the most ambitious school redesign projects in Europe, exchanging traditional walled-in classrooms and rows of desks for more flexible and informal open-plan layouts.

    The aim is to improve the quality of education in Tuusula and more broadly in Finland, by also better allocating the resources in the sector. The project is in line with national and local priorities in education and with the EU priorities and objectives, in particular the European Education Area 2025 strategy. Additionally, the project is expected to improve the energy efficiency of the Turku's education estate by providing more efficient new educational facilities and by renovating existing ones. The project is therefore eligible under Article 309 point (c) common interest (Innovation, Digital & Human Capital: education and training) and (c) common interest (Climate Action and Environmental Sustainability).

    Additionnalité et impact

    The new and upgraded infrastructure financed by the EIB will accelerate the modernisation of teaching and learning environments in terms of pedagogical fit, energy efficiency, quality, health and safety, improving the provision of early childhood education and basic education. Through the support to education activities, the Project will favour positive externalities, including inclusive economic growth and increased productivity knowledge externalities, as well as climate and environmental externalities. 


    The EIB financing will offer flexible terms with a favourable availability period offering the possibility to match the drawdown profile with the Project outflows as well as a long maturity. The operation will also provide the Borrower with diversification of their funding sources. 

    Aspects environnementaux
    Passation des marchés

    Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU on EIA does not specifically cover school and educational infrastructure, leaving it at the discretion of the responsible competent authorities to request an EIA on the basis of the location and scale of the works concerned. However, school and educational infrastructure may fall under Annex II of the Directive with respect to urban development. The public buildings will be required to at least meet the energy efficiency targets as defined in Directive 2010/31/EU on the energy performance of buildings and Directive 2012/27/EU on energy efficiency. Social and environmental aspects as well as any aspects related to historical and cultural heritage will be verified during the appraisal.

    The promoter has to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    12 septembre 2024
    20 novembre 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - TUUSULA EDUCATION INFRASTRUCTURE
    Date de publication
    21 Sep 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    178909921
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230578
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes