Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    40 000 000 €
    Pays
    Secteur(s)
    Espagne : 40 000 000 €
    Lignes de crédit : 40 000 000 €
    Date(s) de signature
    5/03/2024 : 40 000 000 €
    Lien vers la source

    Fiche récapitulative

    Date de publication
    22 novembre 2023
    Statut
    Référence
    Signé | 05/03/2024
    20230473
    Nom du projet
    Promoteur – Intermédiaire financier
    OTUA - INNOVATIVE CIRCULAR ECONOMY INVESTMENTS
    OTUA SLU
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 40 million
    EUR 93 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project, located in the Spanish Basque Region, concerns the construction of a new plastics recycling plant to treat automotive shredder residues and the upgrade of existing facilities for metal waste shredding and sorting.

    The aim is to increase the recovery of materials from industrial waste, bringing a positive impact on the quality of the materials currently being recycled. The project will also reduce the amount of waste sent to landfills, in line with the relevant EU Directives, the EU Circular Economy Package, national and regional legislation. Additionally, it will improve the environmental and climate change performance of the promoter.

    Additionality and Impact

    The Project is in line with the InvestEU objective of Environment. By contributing to the recovery of high-quality secondary raw materials, diverting recyclable waste from landfill disposal and energy recovery, the Project aligns with the European Union's legal requirements, Circular Economy Action Plan, and the Green Deal." The circular value recovery contribution of the Project makes it, alongside with other criteria, eligible for an InvestEU guarantee, as foreseen in the EU Sustainable Infrastructure Lending Envelope.

     

    The Project addresses several market failures, such as the lack of recognition of positive externalities from recyclable metals and plastics, insufficient investments in recycling and circular economy initiatives, and the need for long-term financing to support the upfront costs and extended payback periods of sustainable infrastructure projects. Additionally, the Project bridges a gap in the waste treatment and recycling market by introducing an additional step in the end-of-life vehicle treatment process.


    The Project contributes to reduce greenhouse gas emission, enhances public health, reduces environmental impacts associated with waste disposal, creates new jobs, and sustains existing employment.

     

    The Bank provides a signal of the Project's quality, facilitating financing from commercial banks. The Bank offers a flexible financial product, allowing for an extended availability and grace period, as well as flexibility to drawdown thereby providing the Promoter with a long-term financing solution matching the economic life of its investments. These favourable terms contribute to strengthening the Promoter's financial standing, helping to carry out the Project.


    Given the Promoter's experience, there is limited need and scope for technical contribution from the Bank.

     

    It is noted that the Project would not proceed to the same extent and within the same timeframe without the InvestEU support.

    Aspects environnementaux
    Passation des marchés

    The project complies with the hierarchy of waste management, as defined in the European Circular Economy Package, in particular the Landfill Directive 2018/850 (Directive 1999/31/EC as amended) and the Waste Framework Directive 2018/851 (Directive 2008/98/EC as amended). The project supports the implementation of the end-of life vehicles Directive 2000/53, notably its provisions to reduce adverse impacts on the environment. It also aligns well with a Proposal for a Regulation of the European Parliament and of the Council on circularity requirements for vehicle design and on management of end-of-life vehicles (COM/2023/451). During the appraisal of the Project, the EIB will assess compliance with the environmental "acquis", notably the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, as well as other applicable environmental acquis.

    The promoter has been assessed by the EIB as a private company, not subject to the EU rules on public procurement or concessions.

    Milestone
    À l'examen
    Approuvé
    Signé
    18 décembre 2023
    5 mars 2024
    Projets associés
    Lien vers la source

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - OTUA - INNOVATIVE CIRCULAR ECONOMY INVESTMENTS
    Date de publication
    20 déc. 2023
    Langue
    Sujet général
    Prêts
    Numéro du document
    179841311
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230473
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes