Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
195 000 000 €
Pays
Secteur(s)
Grèce : 195 000 000 €
Énergie : 195 000 000 €
Date(s) de signature
16/12/2024 : 195 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
1 octobre 2024
Statut
Référence
Signé | 16/12/2024
20230249
Nom du projet
Promoteur – Intermédiaire financier
PPCR SOLAR PV & BATTERIES FL
PPC RENEWABLES SMSA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 195 million
EUR 457 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The framework loan (FL) will finance renewable energy and battery energy storage projects in Greece.

The aim is to contribute to the EU-wide target of 42.5% of energy from renewable sources in gross final energy consumption (RES) for 2030, in line with the revised EU Renewable Energy (RE) Directive (EU 2023/2413). The operation will also help to achieve the REPowerEU objectives which aim at increasing the RES 2030 target from 32% to 45%. Additionally, it will further support the national renewable energy targets laid out in the Greek National Energy and Climate Plan (NECP). It is expected that the schemes will be located in the Cohesion Priority Regions (less developed) and in the Just Transition Regions.

Additionality and Impact

The operation aligns with InvestEU's objective to develop the energy sector in accordance with the Energy Union priorities, by expanding clean and sustainable renewable energy. It involves developing solar and Battery Energy Storage System (BESS) schemes in Greece, supporting the 2030 decarbonisation and storage targets of Greece's National Energy and Climate Plan and the REPowerEU action plan. All schemes will be located in Cohesion regions (100% Less Developed Regions).

The financing supports the Bank's lending priority objectives in renewable energy, innovative technologies, environmental sustainability, climate action, and social and economic cohesion. Located in Greece's historic lignite centres, the operation contributes to the Just Transition target of the Bank and of the country.

The project will generate low-carbon electricity, thereby reducing carbon emissions and air pollution. BESS enhances electricity system flexibility, integrating more variable renewable generation. Revenues will primarily come from commercial power purchase agreements (cPPAs) and the wholesale market, improving market efficiency and competition. Some schemes may seek market-based regulatory support.

The Promoter's governance and risk management are deemed good (corresponding to medium risks partially managed). The operation is expected to have a positive economic rate of return and broader social benefits by generating renewable electricity at a lower cost than fossil fuels. The Bank's financial contribution is valuable, offering more favourable terms than market alternatives and attracting investors and co-financiers.

The project would not have been carried out (to the same extent) by the EIB without the InvestEU support.


Aspects environnementaux
Passation des marchés

The schemes are expected to fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, requiring the competent authorities to determine whether an EIA is required. Overhead transmission lines for the interconnection of the schemes to the grid falling under the Annex I will be expected to be subject in all cases to an EIA process. The schemes of the proposed operation have been screened in and an EIA has been performed. The schemes have been awarded the environmental permit to proceed with implementation. The EIB will assess the capacity and procedures of the promoter to ensure the schemes' compliance with the sector-relevant national and European environmental regulations. The authorisation procedure and compliance of the schemes with the relevant EU directives, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be further assessed during the appraisal of the individual schemes, in particular the potential cumulative impacts assessment and the impacts on protected flora and fauna, including Natura 2000 sites.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require the promoter to apply those rules.

Milestone
À l'examen
Approuvé
Signé
11 décembre 2024
16 décembre 2024
Lien vers la source
Fiche récapitulative
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - PPCR SOLAR PV & BATTERIES FL
Date de publication
17 Dec 2024
Langue
Sujet général
Prêts
Numéro du document
224500439
Thématique du document
Information Environnementale
Numéro du projet
20230249
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Autres liens
Fiche récapitulative

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes