Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    36 700 000 €
    Pays
    Secteur(s)
    Allemagne : 36 700 000 €
    Industrie : 36 700 000 €
    Date(s) de signature
    2/12/2022 : 36 700 000 €
    Lien vers la source

    Fiche récapitulative

    Date de publication
    16 juin 2022
    Statut
    Référence
    Signed | 02/12/2022
    20220367
    Nom du projet
    Promoteur – Intermédiaire financier
    P-CAM COMMERCIAL DEMO PLANT (IEU GT)
    PURE BATTERY TECHNOLOGIES PTY LTD
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 37 million
    EUR 73 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project consists of the construction and operation in Hagen, Germany, of an innovative first-of-its-kind commercial demonstration plant for the manufacturing of precursor cathode active material (nickel, manganese and cobalt in a specific ratio), which is used in the production of advanced Lithium-ion cells.

    The project will demonstrate commercial-scale operation of an innovative technology to produce precursor cathode active material ("pCAM"). The production process utilises two novel processing steps, which reduce the carbon footprint, improve safety and reduce cost of manufacturing pCAM.

    Additionality and Impact

    The project is eligible under Article 309 point (c) Common interest, and qualifies under the Bank's "Innovation; Digital and Human Capital" public policy goal.


    The project concerns the first full-scale production of an innovative process to produce pCAM, a material that is used in electric vehicle batteries. The production process utilises two novel processing steps which reduce the carbon intensity, improve safety and reduce cost of manufacturing pCAM. The process is unique in that it can operate on both primary raw material call MHP (mixed hydroxide precipitate) and secondary waste battery material (black mass). The process is capable of operating on 100% black mass. 


    The Bank provides the Promoter with high risk debt financing in order to support the commercialization of its innovation (first full commercial scale plant). This type of financing is difficult to access for innovators with a limited track record. The EIB's contribution helps provide both diversification with regard to the promoter's funding mix and a longer maturity.


    Thanks to the GTT financing, the promoter is able to achieve an adequate equity/debt mix and crowd-in private investors. Having access to EIB financing also allows the Promoter to accelerate the deployment of his innovation and reach the market faster.

    Aspects environnementaux
    Passation des marchés

    The proposed demonstration plant will be the first-time deployment of a novel process to produce pCAM, which is used to produce batteries for electric vehicles. The process is breakthrough in terms of low energy requirements, which results in a significant reduction in the greenhouse gas (GHG) emissions compared to conventional technology. The process also utilises less hazardous chemicals compared to the conventional process. The process is also capable of operating on recycled battery material which leads to further GHG savings compared to primary raw materials. The demonstration plant is subject to the licensing requirements of the German Federal Emission Control Act, including a preliminary environmental impact assessment under the UVPG. These laws include the implementations of the IED and EIA Directives. The respective studies have been submitted and the approval process will be followed by a public consultation period. The promoter is in close contact with the competent authorities and stakeholders. The installation also falls under the SEVESO directive as well. The final permit will encompass the operational and construction permits as well as the SEVESO requirements.

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the promoter to apply those rules.

    Projets associés
    Lien vers la source

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - P-CAM COMMERCIAL DEMONSTRATION PRODUCTION PLANT
    Date de publication
    29 nov. 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    161204858
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220367
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes