Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Fiche récapitulative

Date de publication
13 octobre 2022
Statut
Référence
Approuvé | 24/11/2022
20220318
Nom du projet
Promoteur – Intermédiaire financier
BUDAPEST TRAM&TROLLEY ROLLING STOCK (FL20150006)
BKK BUDAPESTI KOZLEKEDESI KOZPONT ZRT
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 15 million
EUR 164 million
Lieu
Secteur(s)
Description
Objectifs

The EIB loan will finance the entire renewal of tram and trolley rolling stock and related infrastructure in Budapest. The project is part of Budapest's Sustainable Urban Mobility Plan that identified the fleet renewal as one of the core measures to improve the quality and attractiveness of public transport.

Renewing the public transport fleet will increase service and comfort levels in Budapest's public transport, thus encouraging the shift from private to public transport. The project will thus have a positive impact in terms of economic and environmental sustainability.

Additionality and Impact

The project is part of Budapest's Sustainable Urban Mobility Plan (Balázs Mór Plan) and consists mainly of the acquisition of trams and trolleybuses, along with some infrastructure interventions to facilitate the new vehicles operation. The renewal of tram and trolleybuses fleets is much needed to maintain and ultimately improve the quality of services offered (in terms of availability, reliability, safety and comfort) on the tram and trolley bus networks. This should strengthen overall the use of public transport and eventually reduce reliance on private modes, decreasing as such negative road traffic externalities (air pollution, noise, GHG emissions, congestion and road safety) while improving travel times and costs (accessibility and affordability), thereby addressing important market failures.

 

The project is expected to deliver economic benefits in terms of user travel time savings, reduction of vehicle operating costs, decreasing risk of accidents and improving environmental conditions, as a result of the expected modal shift from private modes to public transport system. In addition, the new vehicles should reduce the overall cost of operation due to lower maintenance costs and improved energy efficiency, which also translates into lower GHG emissions. Wider economic benefits are also expected, as the project will provide more affordable mobility solutions and facilitate accessibility to employment education and health services.

 

The project helps to fulfil a wide range of Sustainable Development Goals (SDGs) most notably climate change mitigation (viz. SDG 13) and urban infrastructure improvement (viz. SDGs 9 & 11) and is fully in line with EU and EIB objectives on sustainable cities and regions, climate action and environmental sustainability.


The project benefits from EIB's advantageous funding terms. EIB long-term financing and its flexibility regarding e.g. drawdown currency provides additional value for the Borrower in comparison to the terms of alternative financing options such as those typically available on the Bond market. 

Aspects environnementaux
Passation des marchés

None of the project components fall within the scope of Environmental Impact Assessment (EIA) Directive 2014/52/EC, amending Directive 2011/92/EC.

As a public administration entity, the Promoter has followed EU public procurement rules. The contracts have been signed under a Framework Agreement, tendered in accordance with the applicable EU procurement legislation at that time (2004/18/EC as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU), with publication of tender notices in the EU Official Journal, as and where required.

Commentaires

The project is a major allocation under the SPL "COHESION FUND FL IV (HU) (2015-0006)", targeting priority investments under the Transport and the Energy & Environment Operational Programmes and CEF in the EU programming period 2014-2020.

Milestone
Approuvé
24 novembre 2022
Projets associés
Projet apparenté
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - BUDAPEST TRAM&TROLLEY ROLLING STOCK (FL20150006)
Date de publication
8 Mar 2023
Langue
Sujet général
Prêts
Numéro du document
158394226
Thématique du document
Information Environnementale
Numéro du projet
20220318
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Environmental and Social Completion Sheet - BUDAPEST TRAM&TROLLEY ROLLING STOCK (FL20150006)
Date de publication
30 Dec 2024
Langue
Sujet général
Prêts
Numéro du document
226823757
Thématique du document
Information Environnementale
Numéro du projet
20220318
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Autres liens

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes