Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    52 389 964,03 €
    Pays
    Secteur(s)
    Pologne : 52 389 964,03 €
    Transports : 18 650 827,2 €
    Aménagement urbain : 33 739 136,83 €
    Date(s) de signature
    28/11/2024 : 9 251 044,08 €
    29/10/2025 : 9 399 783,12 €
    28/11/2024 : 16 735 034,8 €
    29/10/2025 : 17 004 102,03 €

    Fiche récapitulative

    Date de publication
    2 mai 2024
    Statut
    Référence
    Signé | 28/11/2024
    20220014
    Nom du projet
    Promoteur – Intermédiaire financier
    KIELCE URBAN DEVELOPMENT II
    CITY OF KIELCE
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    PLN 224 million (EUR 52 million)
    PLN 761 million (EUR 177 million)
    Lieu
    Secteur(s)
    Description
    Objectifs

    The Framework Loan (FL) will support eligible investment schemes in line with the development strategy of the City of Kielce.

    The aim is to finance the new construction, refurbishment and upgrade of urban infrastructure, comprising, among others, urban roads (including road safety and climate measures), sport and social facilities (e.g. schools, cultural and emergency services), sustainable mobility (e.g. bicycle and pedestrian paths, public transport), open spaces and green areas. The project will also cover investments in energy efficiency and renewable energy, as well as in cyber security.

    Additionnalité et impact

    This Project is presented under the Ukraine Solidarity Package (2022-0249). It provides co-financing to the urban infrastructure linked, among others, to an increased demand for municipal services related to an inflow of Ukrainian refugees in Kielce. The Project is structured as a Framework Loan to support the implementation of the multi-sector investment plan of the City during the period 2024-2029, as well as the implementation of its Climate Adaptation Strategy and Urban Development Strategy.   

    The Project is aligned with the Bank's Urban Lending Review, the new Transport Lending Policy and the Energy Lending Policy. The underlying investments are within the scope of the EIB integrated territorial development primary objective and public policy goal. Additionally, the Project supports the European Commission and Member States in their response to the war in Ukraine and the ensuing refugee crisis.

    The Project is aligned to the Climate Bank Roadmap, with the Climate Action and Environmental Sustainability contribution estimated at approx. 40% of the total cost. The Project includes sustainable mobility schemes and energy efficiency measures in public buildings, which contribute to climate mitigation. It also includes investments in public green areas and parks, which contribute to climate adaptation and environmental sustainability.

    This is the second multi-sector FL with the City of Kielce and the previous monitoring experience has been satisfactory.

    The Project addresses several market failures and will bring important economic and social benefits, resulting in a more integrated, sustainable, and inclusive development, as well as improvement of the living conditions of the citizens and other people visiting or living in the city, including Ukrainian refugees.

    The EIB loan with the flexible conditions (long tenor matching the economic life of assets financed, flexible drawdowns conditions, grace and availability periods) addresses the City's funding needs and contributes to the stability of the City's financing sources.


    Aspects environnementaux
    Passation des marchés

    The promoter is deemed as having the adequate capacity to verify the compliance with the relevant EU Directives: Directive 2014/52/EU amending the environmental impact assessment (EIA) Directive 2011/92/EU, EU Strategic environmental assessment (SEA), EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. Furthermore, for new and refurbished buildings, the promoter is also deemed capable of ensuring the compliance with EU Directive 2010/31/EU on Energy Performance of Buildings. The project is expected to contribute to the EIB's objectives linked to climate action and environmental sustainability (CA&ES).

    The promoter is deemed to have adequate capacity to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    5 août 2024
    28 novembre 2024
    Projets associés

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - KIELCE URBAN DEVELOPMENT II
    Date de publication
    23 Aug 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    216859192
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220014
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes