Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    49 011 000 €
    Pays
    Secteur(s)
    Italie : 49 011 000 €
    Énergie : 49 011 000 €
    Date(s) de signature
    12/11/2021 : 49 011 000 €
    Lien vers la source
    Fiche technique

    Fiche récapitulative

    Date de publication
    22 novembre 2021
    Statut
    Référence
    Signé | 12/11/2021
    20200924
    Nom du projet
    Promoteur – Intermédiaire financier
    INBRE RUN OF RIVER HYDRO
    INIZIATIVE BRESCIANE - INBRE - SPA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 49 million
    EUR 65 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    Financing the implementation of 12 small run-of-river hydroelectric plants and the restoration of 13 weirs along the Arno river, to control the river flow, restore hydraulic defences and protect biodiversity.

    Financing for a portfolio of mini hydro power plants along the Arno river in Italy.

    Additionality and Impact

    The operation focuses on the implementation of 12 small run-of-river hydroelectric plants and the restoration of 13 weirs along the Arno river, to control the river flow, restore hydraulic defenses and protect biodiversity.


    The EIB investment in the project will support the deployment of new renewable Hydropower energy capacity in Italy, crucial for the achievement of the 2030 targets set out in the final National Energy and Climate Plan.


    This operation addresses the market failures that limit the access to finance of small renewable energy projects, despite the pivotal role they play in contributing to EU energy policy objectives and in the decarbonization strategy to achieve Paris goals. In addition, the investments are expected to generate positive externalities (enhanced biodiversity, flood management), and increase public goods for society (by improving public health) and increased resilience to climate change, which are not effectively reflected in market prices.


    Overall, the project is expected to yield good quality and results, due to the wider benefits to society the project promotes. The implementation and operation of the project is supported by adequate governance and capabilities of the promoter.


    EIB's innovative developer financing leverages the parent company strength to provide financing to early-stage development projects. This operation will free-up the developer's headroom with domestic financial institutions for lending to other pipeline projects, accelerating project development across the portfolio.


    Aspects environnementaux
    Passation des marchés

    The operation is expected to have net positive environmental and social impacts, considering their focus on river control and restoration of hydraulic defenses and compliance with the Water Framework Directive 2000/60/EC. The project will support renewable energy investments that contribute to the reduction of greenhouse gases emissions and other airborne pollutants. The small hydro power plants have already received environmental permits by the competent authority in line with the EU Directive 2014/52/EU amending the EIA Directive 2011/92/EU. The sub-schemes will be further assessed during appraisal. The Bank will assess and if needed will reinforce the Promoter's capacity to appraise sub-schemes for compliance with national regulations and EU environmental and biodiversity requirements as well as its capacity to support the Bank's Public Disclosure Policy, which aims at facilitating access by the public to environmentally relevant information.

    The Promoter has been assessed by the EIB as a private company not subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the Promoter is after all subject to EU public procurement legislation (2014/25/EU), then the Bank would require the Promoter to ensure that contracts for the implementation of the Project will be tendered in accordance with the relevant applicable EU procurement legislation 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Projets associés
    Lien vers la source
    Fiche récapitulative

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - INBRE RUN OF RIVER HYDRO
    Date de publication
    22 déc. 2021
    Langue
    Sujet général
    Prêts
    Numéro du document
    142716203
    Thématique du document
    Information Environnementale
    Numéro du projet
    20200924
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Photogallery

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes