Signature(s)
Montant
85 000 000 €
Pays
Secteur(s)
Afrique du Sud
: 85 000 000 €
Eau, assainissement
: 85 000 000 €
Date(s) de signature
22/12/2005 : 85 000 000 €
Lien vers la source
Fiche technique
Autres liens
Fiche récapitulative
Date de publication
18 octobre 2005
Statut
Référence
Signé | 22/12/2005
20040468
Nom du projet
Promoteur – Intermédiaire financier
Vaal Water Pipeline Project
Republic of South Africa, Department of Water Affairs and Forestry (DWAF) and Trans-Caledon Tunnel Authority (TCTA) as implementing agency.
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 75 million
EUR 300 million
Lieu
Secteur(s)
Description
Objectifs
Construction of an intake in the Vaal dam reservoir and a 118 km pipeline to Secunda to supply up to 160 M m3 of water annually to Eskom and Sasol.
The project’s objective is to meet the growing water demands of ESKOM (power) and SASOL (petroleum products) and to reduce the risk of (an economically very costly) disruption in water supply to the two users.
Aspects environnementaux
Passation des marchés
The project complies with the Bank’s environmental principle of minimisation of negative environmental impacts, and is deemed environmentally acceptable. An extensive public consultation process is an integral part of South Africa’s very sound environmental impact assessment procedures.
Procurement will be in accordance with National Procurement Rules as accepted by the Bank.
Lien vers la source
Fiche récapitulative
Autres liens
Fiche technique