Fiche récapitulative
Date de publication
10 août 2005
Statut
Référence
Signé | 25/11/2005
20040462
Nom du projet
Promoteur – Intermédiaire financier
Deir Azzour Power Plant
Public Establishment of Electricity for Generation and Transmission (PEEGT)
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 200 million
Estimated at EUR 480 million
Description
Objectifs
Construction and operation of a dual-fired Greenfield power generating plant of a base load Combined Cycle Gas Turbine unit of 750 MW.
The project aims at the cost-effective supply of electricity, both to cover the growth of demand and re-establish security of supply. The combined cycle gas turbine technology is expected to raise the average thermal efficiency of the system and thereby to contribute to lowering emissions of greenhouse gases and air polluants per unit of electricity generated.
Aspects environnementaux
Passation des marchés
Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures applied as necessary.
International procurement, in line with EIB guidelines.