Lien vers la source
Fiche technique
Autres liens
Fiche récapitulative
Date de publication
5 août 2004
Statut
Référence
Signé | 04/12/2006
20040279
Nom du projet
Promoteur – Intermédiaire financier
Electrabel - Castelnou Energía SL
ELECTRABEL
General Castaños no 4 - 3a planta
E - 28004 MADRID
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 145 m
Approximately EUR 330 m
Description
Objectifs
Design, construction, commissioning and operation of an 800 MWe natural gas fired combined cycle gas turbine power station (CCGT) located near Zaragoza (Objective 2 area).
The project will meet growing electricity demand on the Iberian Peninsula at a competitive cost using modern gas-fired combined-cycle technology with a relatively low environmental impact.
Aspects environnementaux
Passation des marchés
Compliance with EU environmental directives and national laws shall be ensured.
Procurement procedures are in compliance with relevant EU directives and national and regional legislation.
Lien vers la source
Fiche récapitulative
Autres liens
Fiche technique