Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20250591
Date de publication: 8 décembre 2025

Promoteur – Intermédiaire Financier

STAD GENT

Lieu

Description

The Framework Loan (FL) to support the multi-sector investment plan of the City of Ghent in Belgium, as well as the implementation of its urban regeneration and climate city strategies.

Objectifs

The FL will enable the city to continue investing in the local economy and in improving the quality of life of its citizens. The project will significantly contribute to Climate Action, thanks to the renovation of buildings.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 382 million

Aspects environnementaux

Based on Promoter input, some of the project's underlying investments may fall under Annex I and II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended by the Directive 2014/52/EU, and transposed into national legislation, requiring an EIA based on the competent authority screening on the basis of the related Annex III criteria.. This is to be further assessed at a later stage and prior disbursing against the related schemes, if applicable. The Promoter is deemed as having adequate capacity to ensure that the project is implemented in line with the relevant EU Directives requirements, i.e. EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC, Birds Directive 2009/147/EC, Urban Waste Water Treatment Directive (91/271/EEC) and Water Framework Directive (WFD) 2000/60/EC, where and if applicable, to be further checked during appraisal based on a risk-based approach as defined in the EIBG E&S Policy. Regarding new and renovated buildings, the Promoter is also deemed capable of ensuring the project is implemented in line with EU Directive on Energy Performance of Buildings. The project is expected to contribute to the EIB's objectives linked to climate action and environmental sustainability, and the contribution of the Project will be assessed during appraisal.

Passation des marchés

The promoter shall ensure that contracts for implementation of the Project have been or will be tendered in accordance with the applicable EU procurement legislation Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Information on awarded main suppliers/contractors for the implementation of the envisaged operation is not available.

Statut

À l'examen - 13/10/2025

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Belgique Aménagement urbain