The project involves the construction and operation of a solar photovoltaic plant with an installed capacity of approximately 120 MWp, along with the related transmission infrastructure. It is located in the Sidi Bouzid region of Tunisia and benefits from a power purchase agreement awarded through a government-led tender process.

Objectifs

The aim is to support both EU and national targets for renewable energy generation. It contributes to the EIB’s objectives in the areas of renewable energy, climate action (mitigation) and environmental sustainability (pollution prevention and control). It also plays a key role in helping Tunisia achieve its goal of increasing the share of renewable energy in electricity generation to 35% by 2030.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 34 million

Coût total (montant approximatif)

EUR 81 million

Aspects environnementaux

The project does not require an Environmental Impact Assessment under the national legislation. The promoter has prepared a draft comprehensive environmental and social assessment, which concludes that the potential environmental and social impacts are typically site specific and/or readily identified and addressed through mitigation measures (i.e. the project is likely to have moderate/limited adverse environmental impacts and risks that might be addressed through the application of mitigation hierarchy), and determines that an Environmental and Social Impact Assessment is not required under the EIB's standard 1. The draft assessment indicates limited air emissions, minimal wastewater generation, and minor use of hazardous materials.

Passation des marchés

The promoter shall ensure that the project implementation will be done in accordance with the EIB's Guide to Procurement.

Statut

À l'examen - 19/09/2025

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Tunisie Énergie