Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20240452
Date de publication: 17 novembre 2025

Promoteur – Intermédiaire Financier

GENERALITAT DE CATALUNYA

Lieu

Description

The project will finance the construction of a 4.1 km underground rail line between Plaça Espanya and Gràcia in Barcelona, as an extension of the electrified suburban railway Line 8. It includes two new intermediate stations at Hospital Clínic and Francesc Macià. The line will be operated and managed by Ferrocarrils de la Generalitat de Catalunya.

Objectifs

The objective is to improve access from the Llobregat–Anoia corridor to the city centre, strengthen connections with tram, metro and other rail services, and increase public transport accessibility in the eastern part of the Eixample District. The investment is expected to improve access to the city centre and create new links within the train and metro networks. The promoter estimates that up to 24 million passengers per year will benefit from this new section, resulting in travel time savings and positive externalities.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 300 million

Coût total (montant approximatif)

EUR 609 million

Aspects environnementaux

Where and if applicable, and based on a risk-based approach as defined in the Environmental and Social Policy of the EIB Group, the requirements of the Environmental Impact Assessment Directive (EIA) 2011/92/EU (as amended by Directive 2014/52/EU), Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal. The Project falls within in the projects listed in Annex II of the EIA Directive 2011/92/EU. The project was screened in; the promoter undertook an EIA and obtained environmental consent in 2018 (https://portaldogc.gencat.cat/utilsEADOP/PDF/7724/1697419.pdf).

Passation des marchés

The promoter shall ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Approuvé - 15/12/2025

Milestone
À l'examen
Approuvé
15 décembre 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Transports