Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20240435
Date de publication: 28 juillet 2025

Promoteur – Intermédiaire Financier

AURUBIS AG

Lieu

Description

The project will finance the expansion of a copper electrolysis refining plant at an existing site in Bulgaria. It also includes the construction of a first-of-its-kind recycling facility in Germany, designed to process complex internal and external smelter intermediary products as well as recycling materials.

Objectifs

The promoter's investments aim to address the growing demand for copper—a strategic raw material essential for the production of Net-Zero technologies, including e-mobility, renewables, ICT, as well as aerospace and defence. The expansion of the electrolysis plant will increase the output of copper cathodes—refined, finished copper—at the Pirdop refinery in Bulgaria by 50%, reaching 340,000 tons per year. Through the Complex Recycling Hamburg (CRH) project, the promoter will gain the capacity to process approximately 30,000 additional tons per year of recycled materials and complex internal smelter intermediary products. As a result, the company is streamlining both internal and external value chains, contributing to the circular economy.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 200 million

Coût total (montant approximatif)

EUR 308 million

Aspects environnementaux

Both projects fall under Annex II of environmental impact assessment (EIA) Directive 2011/92/EU (as amended by EIA Directive 2014/52/EU), the Industrial Emissions Directive (IED) 2010/75/EU, Directive 2012/18/EU on the control of major accident hazards involving dangerous substances (SEVESO III), and Decision EU 2016/1032, establishing BAT conclusions (BREF) for the non-ferrous metals industries. A Preliminary Examination (screening) by the authorities during the permitting process determined that new EIAs are not required. The operating permits for both Projects incorporate limits which are compliant with the "best available techniques" as defined in the European Commission's enforcement decision establishing conclusions on the best available techniques for the non-ferrous metals industries under IED of 13 June 2016.

Passation des marchés

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions.

Statut

Signé - 17/07/2025

Milestone
À l'examen
Approuvé
Signé
18 juin 2025
17 juillet 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Bulgarie Industrie