The project involves the construction of a 400 kV high-voltage transmission line spanning approximately 540 kilometres, connecting Abidjan (Anyama) to the East and North of Côte d'Ivoire. The new line will reinforce the regional interconnections to Burkina Faso and Mali. Additionally, the project will include a rural electrification scheme along the line.

Objectifs

The aim is to contribute to a reliable, efficient, and climate-friendly energy supply in the eastern regions of Côte d'Ivoire. The project will also contribute to a more reliable and efficient Ivorian interconnected grid and energy exchange in the West African Power Pool (WAPP) as well as to the integration of renewable energies into the interconnected grid. This operation is in line with the country's new generation-transmission masterplan, contributing to the Nationally Determined Contributions (NDCs) to reduce carbon emissions by 30% and to achieve a 45% share of renewable energies in its energy mix until 2030.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 185 million

Coût total (montant approximatif)

EUR 359 million

Aspects environnementaux

The project's compliance with the applicable national environmental legislation and the EIB's environmental and social principles will be respected. The EIB will require the promoter to comply with the EIB Environmental and Social Standards.

Passation des marchés

As the promoter operates in the utilities sector as a public undertaking, public procurement procedures, as set in the EIB's Guide to Procurement, will apply. The promoter shall ensure that the implementation of the project will be done in accordance with the EIB's Guide to Procurement.

Statut

À l'examen - 27/02/2025

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Côte d'Ivoire Énergie