Date de publication: 10 février 2005
Promoteur – Intermédiaire Financier
SAVContact point: Dott. M. Christillin, Direttore,
1024 Chatillon (AOSTA) - Strada Barat 13
Tel. 0166/560411 SITAF
Contact point: Ing. Bernardo Magrì, Direttore,
10059 Susa (To) - Fraz. San Giuliano 2
Tel. 0122 621 615
Lieu
Description
Upgrading to new environmental and safety standards of two TENs: the A 32 highway Torino-Bardonecchia, including the Frejus Tunnel (giving access to France) and the A5 Torino-Aosta - Gran San Bernardo Tunnel (giving access to Switzerland).
Objectifs
Improve driving and safety conditions on two TENs connecting Italy’s North-West, the country’s largest industrialized area, to France and Switzerland.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 160 million
Coût total (montant approximatif)
EUR 400 million
Aspects environnementaux
Due to its nature the project should be beneficial to the environment. However motorway construction, or upgrading, is subject to the requirements of EU Directive 07/11/CE, Annex 1. Documents will be checked during appraisal.
Passation des marchés
SAV and SITAF have concession agreement with ANAS, state company. Conformity with EU procurement regulations is going to be assessed.
Statut
Signé - 20/06/2005