Date de publication: 21 décembre 2005
Promoteur – Intermédiaire Financier
Elia System Operator SALieu
Description
Upgrade and reinforcement of the high-voltage electricity grid in Belgium.
Objectifs
By maintaining an adequate and cost-effective supply of electricity, the project would contribute to the rational use of energy and is expected to support the economic development in Belgium and its neighbouring countries.
Commentaires
Electricity transmission.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Approx. EUR 125 million.
Coût total (montant approximatif)
Approx. EUR 270 million.
Aspects environnementaux
Belgian legislation does not require an EIA for reinforcing the existing overhead transmission lines included in this project. Other project components do not fall under EIA directive.
Passation des marchés
The promoter has confirmed that their procurement rules are fully in line with the EU public procurement procedures (Utilities Directive 93/38/EC pending transposition of 2004/17/EC) and include publication in the OJEU.
Statut
Signé - 19/12/2005