Référence: 20010494
Date de publication: 22 novembre 2001

Promoteur – Intermédiaire Financier

Energie-Versorgung Niederösterreich AG (EVN), Maria Enzersdorf, Niederösterreich

Lieu

Description

The project concerns the construction of a large waste incineration plant with a 350.000 t/a throughput capacity. The waste is to be incinerated by grate firing, with a downstream boiler plant. The steam from the incinerator will, in turn, generate an energy output of 120 MW in the nearby -EVN held- power station's steam cycle.

Objectifs

The project is one of a series aiming at the implementation of recent Austrian legislation regulating the treatment of non-recycled municipal waste after 2004, when the joint effect of the Austrian Ordinance Governing Waste Dumps, water laws and the Amendment of the Act Governing Reclamation of Contaminated Sites will call for an additional incineration capacity for 2.8 million metric tons at ecologically state-of-the-art facilities fitted with flue gas cleaning systems.

Commentaires

Waste management

Secteur(s)

Montant BEI envisagé (montant approximatif)

About EUR 55 million

Coût total (montant approximatif)

About EUR 144 million

Aspects environnementaux

The request for the construction permit was sent to the public authorities in May 1998. As requested by the licensing authorities, a formal EIA has been carried out in compliance with the requirements set by the EC Directive 85/337. The government’s environmental impact assessment was completed in January 2000. In June 1997, a referendum had shown that 74% of the population of Zwentendorf was in favour of the project. The licensing procedure also incorporated a public hearing, which took place in January 2000.

Passation des marchés

Procurement started in February 2000. All technical components were tendered at EU level, in accordance with the EC-Directive.

Statut

Signé - 6/06/2002

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Autriche Déchets solides