Référence: 20010335
Date de publication: 20 septembre 2002

Promoteur – Intermédiaire Financier

National Grid Company plc (“NGC”), owner and operator of the high voltage electricity transmission system in England and Wales.

Contact points:
Marcy Reed, Investor & Media Relations, Tel +44 20 7312 5779
Martin O'Donovan, Group Treasury, Tel +44 20 7312 5803

Lieu

Description

The promoter is implementing a multi-annual investment programme aimed at renewing, reinforcing and extending the England & Wales electricity transmission system. It is comprised of a large number of geographically dispersed schemes on the promoter's electricity transmission network.

Objectifs

The schemes proposed for EIB co-financing would enhance reliability and safety of electricity supply, facilitate new connections (including distributed and renewable generation) and reduce losses. In addition, a material portion of the schemes is located in regional development areas.

Commentaires

Electricity

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to GBP 200 million

Coût total (montant approximatif)

Approximately GBP 1 billion.

Aspects environnementaux

The Project primarily comes under Annex II of the Environmental Directive 85/337/EEC as amended by 97/11/EC. Some of the Project schemes may be classified under Annex I and as such require formal EIA. These aspects, including compliance with all applicable national and EU environmental legislation, will be assessed during project appraisal.

Passation des marchés

The promoter's investment programme includes new and replacement electricity cables, transformers, switchgear, overhead lines and towers. The procurement procedures adopted by the promoter comply with the relevant national and EU legislation (93/38/EEC). Such procedures will be verified during appraisal.

Statut

Signé - 28/11/2002

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Royaume-Uni Énergie