Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
150 000 000 €
Pays
Secteur(s)
Espagne : 150 000 000 €
Aménagement urbain : 150 000 000 €
Date(s) de signature
10/02/2026 : 150 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
13 janvier 2026
Statut
Référence
Signé | 10/02/2026
20250708
Nom du projet
Promoteur – Intermédiaire financier
BBVA SUPPORT TO HOME OWNERS ASSOCIATIONS
BANCO BILBAO VIZCAYA ARGENTARIA SA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 150 million
EUR 333 million
Lieu
Secteur(s)
Description
Objectifs

The project consists of a Delinked Risk Sharing operation whereby BBVA will use the proceeds to finance new Climate Action and Environmental Sustainability eligible investments in Spain, in line with the EIB's Action Plan for Affordable and Sustainable Housing.

The aim of the project is to support Spanish homeowners' associations, small and medium-sized enterprises (SMEs), MidCaps, and private individuals by financing energy-efficient building refurbishments and the construction of nearly zero-energy buildings (NZEBs+). The new portfolio will primarily focus on integral refurbishments undertaken by homeowners' associations, as well as green mortgages for private individuals and NZEBs+ construction by SMEs and MidCaps.

Additionality and Impact

The proposed operation is a EUR 150m EIB guarantee to enable BBVA to unlock EUR 300m for sustainable housing in Spain. BBVA will finance mainly building renovations for homeowners' associations, green mortgages for households, and near-zero-energy buildings for SMEs and MidCaps. These activities will be carried out by private individuals, homeowner associations responsible for building refurbishment, SMEs and MidCaps.


The operation supports the EU's and Bank's priorities in the energy sector, the EIB's climate action objectives, and will contribute to the achievement of Spain's National Energy and Climate Plan. The operation enhances access to finance for final beneficiaries for Climate Action related investments and improves financing conditions for them through long term tenors and favourable financing conditions. The operation is aligned with the European Investment Bank's Action Plan for Affordable and Sustainable Housing.


Financial intermediaries, including BBVA, are pivotal in this transition, as financing is crucial for unlocking the investments needed for its realisation. The operation contributes to reducing the market failures linked to asymmetric information and split incentives between property owners, who undertake energy efficiency investments, and tenants, who pay the energy bills. Thermal comfort in the dwellings is ensured while households' energy costs/consumption are kept to minimal levels.

Spain's building stock is very old and energy inefficient. Most buildings date from the 1980s and have an energy certificate rating of F or G. Rehabilitation activities are often delayed due to a lack of major incentives from regional governments. Approvals for renovations in large multifamily buildings are also difficult. For example, in Madrid only 20% of proposed renovations in large apartment blocks are approved within a year. Spain's investment needs are significant, as outlined in the National Energy and Climate Plan, which allocates around EUR 35 billion to building renovations by 2030. However, the current renovation rate remains below 1%, far short of the approximately 3% required to achieve timely decarbonisation.


To address these challenges, policy changes and new incentives could play a crucial role in increasing the renovation rate. Enhanced government support, streamlined approval processes, and targeted financial incentives for homeowners and associations may help close the gap between current activity and the levels needed for Spain to meet its energy and climate targets. By encouraging more renovations, Spain can make meaningful progress toward improving energy efficiency and reducing carbon emissions in its ageing building stock.


The Financial Intermediary is deemed to be capable of implementing the operation considering its overall experience. The operation is expected to be both financially and economically viable, with a good economic rate of return (ERR) and good broader social benefit.


The project would not have been carried out (to the same extent) without the EIB support. At project implementation and monitoring the EIB will perform ad hoc interventions, e.g. monitoring missions, to ensure compliance with Annual PPR.


A part of the project is located in transition regions (51% approximately, ex-ante calculation based on GDP) and the project will stimulate the local construction industry.

Aspects environnementaux
Passation des marchés

The proposed operation falls within the scope of the EIB's Environmental and Social Standards - "Standard 11 Intermediated Finance". The Borrower / Financial Intermediary has adequate capacity, systems and processes in place for identifying, assessing, managing and monitoring environmental, climate and social (ECS) risks related to the potential sub-projects benefitting from EIB support. The Final beneficiaries will be required to comply with applicable national and EU legislation in respect of environmental and social matters, as appropriate.

In accordance with the EIB's policy to ensure that sub-loans comply with the EU acquis, in particular in the fields of environment and public procurement, BBVA has to to take all the requisite measures to ensure that the environment and procurement procedures carried out by the final beneficiaries, will comply with the relevant EU legislation and the applicable national legislation, provided that these are in line with EU rules.

Milestone
À l'examen
Approuvé
Signé
6 février 2026
10 février 2026
Lien vers la source
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - BBVA SUPPORT TO HOME OWNERS ASSOCIATIONS
Date de publication
11 Feb 2026
Langue
Sujet général
Prêts
Numéro du document
258145005
Thématique du document
Information Environnementale
Numéro du projet
20250708
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes