    Montant
    63 500 000 €
    Pays
    Secteur(s)
    Belgique : 63 500 000 €
    Énergie : 63 500 000 €
    Date(s) de signature
    16/02/2026 : 63 500 000 €

    Fiche récapitulative

    Date de publication
    16 septembre 2025
    Statut
    Référence
    Signé | 16/02/2026
    20240828
    Nom du projet
    Promoteur – Intermédiaire financier
    FLUVIUS GREEN BOND FRAMEWORK (GBPP)
    FLUVIUS SYSTEM OPERATOR
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 125 million
    EUR 300 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    This operation concerns the purchase of Green Bonds, with proceeds financing new eligible projects in the Flemish Region. The Green Finance Framework includes investments in green infrastructure (such as electricity distribution infrastructure for renewable energy integration and retrofitting gas networks for renewable or low-carbon gases), energy efficiency, and sustainable water and wastewater management. However, the Promoter has indicated that the projects to be financed with the bond proceeds will mainly relate to the electricity sector, including distribution network infrastructure and/or equipment, as well as LED rollout in public lighting. Therefore, to ensure a streamlined appraisal, such projects will focus exclusively on electricity sector investments.

    The aim is to support the EU renewable energy and greenhouse gas emission reduction, as well as competitive and secure energy objectives. The project is expected to contribute to the EIB Group's climate action and environmental sustainability objectives, in particular to climate mitigation, climate adaptation, sustainable use and protection of water resources.

    Additionnalité et impact

    The green bonds will finance green energy network infrastructure, energy efficiency, and sustainable water and wastewater management in the Flemish Region (Belgium).

    The EIB eligible projects will only include electricity distribution network infrastructure (reinforcement and extension of the distribution grid, enabling the connection and integration of renewable capacity, and electric vehicle charging stations) and/or equipment (controlling systems, smart meters), as well as LED roll-out in existing public lighting.

    Hence, the operation will contribute to European climate and REPowerEU policy objectives, as well as to the decarbonisation targets set out in National Energy and Climate Plan for Belgium and in the Regional (Flemish) Energy and Climate Plan.

    The project addresses negative climate and environmental externalities and contributes to the provision of public goods such as maintaining or increasing security of supply.

    This financing contributes to the Bank's lending priority objectives on energy and is deemed to have very high contribution to the Climate Action (climate change mitigation).

    The economic rate of return and broader social benefits are rated as good. The promoter's electricity distribution activities are subject to regulatory oversight. The promoter is highly experienced in implementing works of this nature, with a sound project management structure.

    EIB's involvement in the bond process is expected to diversify Fluvius' green investor base. The project will support Fluvius in attracting long term financing from public debt markets for the company's ambitious investment plan related to the Flemish green energy system.


    Aspects environnementaux
    Passation des marchés

    Most of the projects financed with the bond proceeds are expected to fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU, as amended by EIA 2014/52/EU, requiring screening by the national competent authority on the basis of Annex III of the same Directive, to determine the need for any EIA. The impacts that can be typically expected relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC Directives).

    The promoter shall ensure that the contracts for the project implementation have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    6 janvier 2026
    16 février 2026

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - FLUVIUS GREEN BOND FRAMEWORK (GBPP)
    Date de publication
    8 Jan 2026
    Langue
    Sujet général
    Prêts
    Numéro du document
    252154494
    Thématique du document
    Information Environnementale
    Numéro du projet
    20240828
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes