Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    500 000 000 €
    Pays
    Secteur(s)
    Italie : 500 000 000 €
    Énergie : 500 000 000 €
    Date(s) de signature
    23/07/2025 : 500 000 000 €

    Fiche récapitulative

    Date de publication
    31 juillet 2025
    Statut
    Référence
    Signé | 23/07/2025
    20240694
    Nom du projet
    Promoteur – Intermédiaire financier
    ENI BIOREFINERY
    ENI SPA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 500 million
    EUR 741 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The project concerns the construction and operation of a 500 ktpa advanced second-generation biofuels production facility located in Livorno, in the Tuscany region of Italy.

    The project aligns with the EU's broader decarbonisation goals, aiming for climate neutrality by 2050. It contributes to the EU Green Deal and the Fit 55 package by supporting a 55% reduction in greenhouse gas (GHG) emissions by 2030. The biofuel plant focuses on replacing fossil fuels to decarbonise the transport sector, aiding the EU targets outlined in the REDIII Directive. Notably, the plant will use feedstock listed in Annex IX parts A and B of the Directive. Additionally, the new facility supports the RePowerEU objectives by enhancing the EU's capacity to produce clean alternatives to fossil fuels. This helps reduce reliance on fuel imports and enhances energy security. The project also aligns with Fuel EU Maritime and could, in the future, support ReFuel EU Aviation targets by supplying low-carbon fuels for challenging-to-decarbonise sectors.

    Additionnalité et impact

    The Project is well aligned to the EU decarbonization policies and contributes, among the others, to achieving the objectives of the Green Deal, the "FIT for 55" package, the REDIII (EU/2023/2413) Directive and the RePowerEU, by enhancing the EU production capacity of clean alternatives to fossil fuels, i.e. Hydrogenated Vegetable Oil (HVO) low carbon biofuels produced from biomass residues.

     

    The low-carbon biofuels produced will reduce carbon and air pollution externalities from the transport sector. The upcycling of waste like Used Cooking Oil (UCO), animal fats and other industry residues, reduce negative impacts from their alternative disposal. Low-carbon technologies contribute towards increasing security of energy supply, considered as a public good. The investment is therefore strongly aligned to several EIB Public Policy Goals.

     

    The Project is implemented by an experienced Promoter that has a strong experience in the biofuels sector, including in similar projects. The Project allows ENI to increase the share of low carbon fuels it produces, supporting the Company's shift towards sustainability. In fact, the Project will be the first step towards the conversion of the Livorno refinery into a biorefinery site.

    The produced second generation (2G)/advanced biofuels will deliver significant Greenhouse Gas (GHG) savings. This will result in economic returns that are significantly higher than the financial returns.

     

    The Bank's financial contribution is considered valuable to the client, as the EIB's offering is more favourable than other market alternatives under various dimensions (e.g. longer tenor, availability and grace periods, convertible or revisable rates). The EIB loan will further diversify the Borrower's financing sources, complementing those from commercial banks and the capital markets.

    Aspects environnementaux
    Passation des marchés

    The project will be appraised and monitored in line with the relevant EIB's policies, including the Environmental and Social Sustainability Framework. Compliance with the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) and with the Industrial Emissions Directive 2010/75/EU will be verified during the appraisal.

    The EIB has assessed the Promoter as a private company not subject to EU rules on public procurement or concessions. However, if during the project appraisal the EIB determines that the Promoter is subject to EU public procurement legislation, the European Commission will be notified, and the Promoter will need to comply with those rules.

    Étapes
    À l'examen
    Approuvé
    Signé
    24 juin 2025
    23 juillet 2025

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - ENI BIOREFINERY
    Date de publication
    12 Aug 2025
    Langue
    Sujet général
    Prêts
    Numéro du document
    243474616
    Thématique du document
    Information Environnementale
    Numéro du projet
    20240694
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens
    Fiche récapitulative
    Fiche technique

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes