Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    154 679 040 €
    Pays
    Secteur(s)
    Hongrie : 154 679 040 €
    Transports : 154 679 040 €
    Date(s) de signature
    18/12/2025 : 154 679 040 €

    Fiche récapitulative

    Date de publication
    16 décembre 2024
    Statut
    Référence
    Signé | 18/12/2025
    20240672
    Nom du projet
    Promoteur – Intermédiaire financier
    MAV RAIL INFRA MODERNIZATION PROGRAMME
    MAV PALYAMUKODTETESI ZRT,MINISTRY OF CONSTRUCTION AND TRANSPORT - HUNGARY
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    HUF 382796 million (EUR 1001 million)
    HUF 765593 million (EUR 2002 million)
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project includes several schemes to upgrade and rehabilitate Trans-European Transport Network (TEN-T) and suburban railway lines, investments in traffic control, signalling and power supply for railway lines, as well as the purchase of various railway maintenance vehicles and equipment.

    The project is expected to improve the quality of rail services and promote rail travel in Hungary. It will help prevent a shift from rail to road, reducing negative impacts on the local environment such as greenhouse gas emissions. It will also deliver environmental and safety benefits and generate savings in vehicle operating costs. By contributing to interoperability within the EU railway system, the project is expected to strengthen the competitiveness of rail compared with other modes and thereby enhance sustainable transport in line with EU objectives. The project is mainly located in EIB Cohesion Priority Regions and, by improving access, will support regional development. Some schemes aim to increase the capacity of existing lines and remove bottlenecks, enabling traffic growth. On sections where works allow higher maximum speeds or prevent speed reductions, the project may also generate time savings for passengers.

    Additionnalité et impact

    The project consists of several schemes of upgrading, modernisation and renewal of TEN-T and suburban railway lines, investment in traffic control, signalling and power supply for railway lines, as well as acquisition and modernisation of various rail infrastructure maintenance vehicles and equipment.

    The project is expected to improve the quality and capacity of rail infrastructure throughout Hungary, enhancing sustainable transport in line with EU objectives and reducing negative transport externalities, thus addressing important market failures. These externalities include pollution from the road diesel/petrol engines and the related noise and CO2 emissions. Furthermore, sustained or increased modal share of rail as the safest mode of land transport, as well as increased safety of level crossings will lead to reduction of fatalities and serious accidents and the associated human suffering.

    Being mainly located in cohesion regions, the project will also contribute to increasing the competitiveness and regional development of these regions, by improving their connectivity thus contributing to sustainable growth. Finally, by means of contributing to achieving interoperability of the EU railway system, the project is expected to improve competitiveness of rail vis à vis other modes.

    The EIB financing is structured to adequately address the Borrower's financing needs for the project and will accelerate its implementation. It is enhanced by JASPERS contribution to some of the key strategic documents such as relevant railway master plans and Budapest Railway NODE strategy as well as support during CEF application including CEF Military Mobility for selected schemes.


    Aspects environnementaux
    Passation des marchés

    The project will consist of multiple schemes and their compliance with the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) and the development consents will be reviewed during appraisal. The project's potential impacts on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) will also be appraised. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share. Furthermore, the project is expected to contribute to climate action and environmental sustainability objectives, in particular to climate change mitigation.

    The promoter shall ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    19 novembre 2025
    18 décembre 2025

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - MAV RAIL INFRA MODERNIZATION PROGRAMME
    Date de publication
    2 Dec 2025
    Langue
    Sujet général
    Prêts
    Numéro du document
    253843441
    Thématique du document
    Information Environnementale
    Numéro du projet
    20240672
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes