Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
170 000 000 €
Pays
Secteur(s)
Maroc : 170 000 000 €
Énergie : 170 000 000 €
Date(s) de signature
22/05/2025 : 170 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
21 mai 2024
Statut
Référence
Signé | 22/05/2025
20230866
Nom du projet
Promoteur – Intermédiaire financier
ONEE - TRANSMISSION ENERGIE RENOUVELABLE
OFFICE NATIONAL DE L'ELECTRICITE ET DE L'EAU POTABLE
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 170 million
EUR 355 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The project consists of a multi component investment programme covering the period 2024-2029, that includes several electricity transmission schemes, from 60 kV to 400 kV, geographically dispersed throughout the country.

The aim is to reinforce and extend the country's electricity infrastructure (transmission lines and substations) by reducing losses, enhancing reliability and meeting new electricity demand. Additionally, the programme includes the integration of new renewable electricity generation capacity that will ensure a more sustainable and efficient power system.

Additionality and Impact

The Project is a multi-component, multi-annual investment programme aimed at reinforcing and extending the electricity transmission network of Morocco and at integrating the additional renewable energy production.


The financing is strongly aligned with Morocco national targets for decarbonisation in the context of the Intended Nationally Determined Contributions of the country. The Project will contribute to EU policy objectives of sustainable energy infrastructure and combating climate change. It will be contributing to the following Sustainable Development Goals: SDG 1 (no poverty), SDG 7 (access to affordable, reliable and sustainable energy), in particular sub goal 7.2 (increase the share of renewable energy in the global energy mix), SDG 8 on inclusive and sustainable economic growth, SDG 13 (combat climate change), and SDG 17 (partnerships for the goals).


This operation is in line with EU priorities for Morocco and eligible under NDICI, as it contributes to climate change mitigation as well as to the development of social and economic infrastructure, specifically energy, the energy sector being one of EU's top priorities in the Southern Neighbourhood as defined notably in the EU-Morocco Green Partnership.


The Project will address several market failures. Individually, each sub-project addresses negative climate and environmental externalities through the reduction of carbon emissions and air pollution and the market failure associated with security of supply, which has dimensions of public good.


The Project will facilitate the development and/or expansion of regional economy. The economic rate of return and broader social benefits are expected to be respectively good and excellent for the sub-projects. The Project is supported by adequate governance and capabilities of the Promoter.


Finally, EIB's financial and non-financial contribution is excellent. The Bank is cooperating closely with KfW under Mutual Reliance Initiative (MRI) for Project due diligence and monitoring optimising project implementation for the Promoter. EIB will be the leading financing institution under the MRI with KfW. The loan has distinctive features such as long maturity and grace period which are not traditionally available on the market. The EIB provided an excellent level of technical support contributing to the improved structure of the Project and its components. Technical assistance was also provided on different aspects of the Project (notably E&S), enhancing its overall structure and its components. 


Aspects environnementaux
Passation des marchés

The envisaged sub-projects (new transmission lines and substations from 60 kV to 400 kV) are expected to require a full Environmental and Social Impact Assessment (ESIA) study in accordance with national law. The exact requirements and status of the permitting procedures will also be further assessed during the appraisal. The promoter shall comply with EIB's Environmental and Social standards.

The promoter has to ensure that the project implementation will be done in accordance with the EIB's Guide to Procurement.

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Milestone
À l'examen
Approuvé
Signé
30 avril 2025
22 mai 2025
Lien vers la source
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - ONEE - TRANSMISSION ENERGIE RENOUVELABLE
Date de publication
15 May 2025
Langue
Sujet général
Prêts
Numéro du document
243233064
Thématique du document
Information Environnementale
Numéro du projet
20230866
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes