Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    73 399 209,12 €
    Pays
    Secteur(s)
    Suède : 73 399 209,12 €
    Industrie : 73 399 209,12 €
    Date(s) de signature
    30/09/2022 : 73 399 209,12 €

    Fiche récapitulative

    Date de publication
    9 février 2023
    Statut
    Référence
    Signé | 30/09/2022
    20220021
    Nom du projet
    Promoteur – Intermédiaire financier
    ENERGY EFFICIENT HOUSING COOPERATIVE GREEN LOAN
    STOCKHOLMS KOOPERATIVA BOSTADSFOERENING
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    SEK 800 million (EUR 75 million)
    SEK 1120 million (EUR 105 million)
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project will finance the construction of highly energy efficient housing units in Sweden on a cooperative model.

    The aim is to increase the offer of rental units in the Swedish housing market. Through energy savings, it will contribute to achieve social benefits such as the reduction of carbon emissions, air pollution, and dependency on energy imports.

    Additionnalité et impact

    The operation consists of an investment loan to finance the construction of highly energy efficient buildings located in the Stockholm Metropolitan Area. The operation supports the EU's and Bank's priority in the energy sector and the EIB's climate action objectives.


    The operation meets an existing demand for highly efficient housing units in Stockholm, a market characterized by constraints in housing supply and rapidly growing real estate and rental prices. The operation contributes to reduce the market failures linked to asymmetric information and principal/agent problem: Thermal comfort in the dwellings is ensured while households energy costs/ consumption is kept to minimal levels. The risk of energy poverty, which has been accentuated with the recent increases in energy prices due to the Ukrainian conflict is therefore minimized.


    The Promoter is deemed to be capable of implementing the operation considering its overall experience and the experience gained in past operations with the Bank. The operation is expected to be both financially and economically viable, with a relatively small, yet positive, ERR. By providing a long-term unsecured loan, the EIB is strengthening the capital structure of the promoter, which is also to the benefit of private sector financiers.

    Aspects environnementaux
    Passation des marchés

    The project is expected to generate positive environmental benefits related to a reduction of energy consumption and greenhouse gas (GHG) emissions. It will also lead to a decrease on energy expenses of the unit users. At construction stage, the project implementation may lead to increased noise and vibration level and may affect quality air. Adequate mitigation measures will be implemented together with the enforcement of best practices. The project impacts at construction stage will be reversible and temporary at a level that are deemed acceptable. The project will comply with the Energy Performance of Buildings Directive (Directive 2010/31/EU), as amended by Directive 2018/844/EU and Directive 2018/2002/EU amending Directive 2012/27/EU on energy efficiency. The promoter's environmental management capacity to properly apply the relevant EU Directives will be verified during appraisal, particularly with regard to EU EIA Directive 2011/92/EU amended by 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. Some of the projects, namely construction of new buildings, may fall under Annex I or Annex II of the environmental impact assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. This will be further assessed during project appraisal.

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/24/EU then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation Directive 2014/24/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the EU Court of Justice, with publication of tender notices in the EU Official Journal, as and where required.

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - ENERGY EFFICIENT HOUSING COOPERATIVE GREEN LOAN
    Date de publication
    8 Mar 2023
    Langue
    Sujet général
    Prêts
    Numéro du document
    157088482
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220021
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes