Signature(s)
Montant
350 000 000 €
Pays
Secteur(s)
Portugal
: 350 000 000 €
Transports
: 350 000 000 €
Date(s) de signature
11/01/2008 : 350 000 000 €
Lien vers la source
Fiche technique
Autres liens
Fiche récapitulative
Date de publication
30 mars 2005
Statut
Référence
Signé | 11/01/2008
20020676
Nom du projet
Promoteur – Intermédiaire financier
Douro Litoral Public Private Partnership (IC24)
A special purpose company.
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
Up to 50% of total project cost.
Indicatively estimated at EUR 600m.
Lieu
Secteur(s)
Description
Objectifs
The project involves the design, construction and operation of 83km of new motorway under a long-term, real toll concession. The project will also include the operation of a further 47km of existing non-toll motorway.
By delivering high quality road infrastructures, the project will contribute to the reduction of traffic congestion at the local level and improve road safety and traffic conditions in the greater Porto area.
Aspects environnementaux
Passation des marchés
Compliance with EU environmental directives and national laws to be ensured.
The project has been advertised in the Official Journal of the EU in accordance with EC Directive 93/37/CEE.
Lien vers la source
Fiche récapitulative
Autres liens
Fiche technique
Publications connexes