Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20240692
Date de publication: 12 septembre 2025

Promoteur – Intermédiaire Financier

MUNICIPALITY OF ATHENS

Lieu

Description

The operation will finance energy efficiency interventions in public schools across the Municipality of Athens.

Objectifs

The aim is to implement energy efficiency measures through an initial pipeline of 32 schools proposed by the municipality.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 75 million

Coût total (montant approximatif)

EUR 100 million

Aspects environnementaux

This operation is intended to generate environmental benefits by supporting renewable energy and energy efficiency projects that help mitigate climate change. The project is therefore expected to generate positive environmental benefits related to a reduction of energy consumption and greenhouse gas (GHG) emissions. It will also lead to a decrease on energy expenses of the unit users compared to the baseline scenario. The energy efficiency sub-projects will be implemented in compliance with the Energy Performance in Buildings Directive (EPBD) 2024/1275/EU, amending 2010/31/EU. The sub-projects will reduce the energy consumption of buildings and the associated pollutant emission. The energy efficiency sub-projects are not expected to fall under the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, provided that the buildings will be integrated in urban areas. Where and if applicable, and based on a risk-based approach as defined in the EIBG E&S Policy, the requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal.

Passation des marchés

The promoter shall ensure that contracts for implementation of the project have been/will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

À l'examen - 30/10/2024

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Grèce Énergie