Référence: 20240672
Date de publication: 16 décembre 2024

Promoteur – Intermédiaire Financier

MAV PALYAMUKODTETESI ZRT,MINISTRY OF CONSTRUCTION AND TRANSPORT - HUNGARY

Lieu

Description

The project includes several schemes to upgrade and rehabilitate Trans-European Transport Network (TEN-T) and suburban railway lines, investments in traffic control, signalling and power supply for railway lines, as well as the purchase of various railway maintenance vehicles and equipment.

Objectifs

The project is expected to improve the quality of rail services and promote rail travel in Hungary. It will help prevent a shift from rail to road, reducing negative impacts on the local environment such as greenhouse gas emissions. It will also deliver environmental and safety benefits and generate savings in vehicle operating costs. By contributing to interoperability within the EU railway system, the project is expected to strengthen the competitiveness of rail compared with other modes and thereby enhance sustainable transport in line with EU objectives. The project is mainly located in EIB Cohesion Priority Regions and, by improving access, will support regional development. Some schemes aim to increase the capacity of existing lines and remove bottlenecks, enabling traffic growth. On sections where works allow higher maximum speeds or prevent speed reductions, the project may also generate time savings for passengers.

Secteur(s)

Montant BEI envisagé (montant approximatif)

HUF 382796 million (EUR 1001 million)

Coût total (montant approximatif)

HUF 765593 million (EUR 2002 million)

Aspects environnementaux

The project will consist of multiple schemes and their compliance with the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) and the development consents will be reviewed during appraisal. The project's potential impacts on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) will also be appraised. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share. Furthermore, the project is expected to contribute to climate action and environmental sustainability objectives, in particular to climate change mitigation.

Passation des marchés

The promoter shall ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Approuvé - 19/11/2025

Milestone
À l'examen
Approuvé
19 novembre 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Hongrie Transports