Référence: 20240660
Date de publication: 11 novembre 2025

Promoteur – Intermédiaire Financier

LINZ AG FUER ENERGIE TELEKOMMUNIKATION VERKEHR UND KOMMUNALE DIENSTE

Lieu

Description

The project will finance the rehabilitation of water and wastewater infrastructure and heat exchanger for district heating and district cooling in the City of Linz.

Objectifs

The project is an investment programme that comprises investment schemes in the promoter's district heating and cooling networks, water supply system, sewer network and the wastewater treatment plant. The programme's energy component includes two investments in district heat generation and cooling in Linz: - The first project component concerns the construction of two District Heating (DH) exhaust heat recovery units with heat pumps (35MW in total), in a waste incinerator and biomass power plant in Linz Mitte. - The second project component concerns the construction of district cooling centre FHKW Mitte (20MW), and expansion of the district cooling network (47 MW connection load), including the construction of a multi-utility tunnel. Both district heating and cooling systems will fulfil the criteria of efficient networks, as stipulated by the Energy Efficiency Directive. The water and wastewater part of the programme comprises four main components: - Water production: modernisation of wells, pumping stations and service reservoirs, - Water distribution: replacement and/or rehabilitation of transmission and distribution mains and house connections, - Wastewater collection: replacement and/or rehabilitation of sewers, - Wastewater treatment: modernisation of several components in the wastewater treatment plant.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 200 million

Coût total (montant approximatif)

EUR 334 million

Aspects environnementaux

For the water component, the project aims at maintaining compliance with the Urban Wastewater Treatment Directive (91/271/EEC), the Drinking Water Directive (2020/2184/EU), and the Water Framework Directive (2000/60/EC). For both the energy and water components, some schemes may fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The exact requirements, as well as, where and if applicable, the requirements of Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC, will be verified during appraisal. The schemes are expected to have limited environmental impact. The environmental and social due diligence will follow the programme lending approach according to the EIB's standards. It will focus on the promoter's capacity to implement the programme in line with the EIB's environmental and social standards and requirements.

Passation des marchés

The Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Approuvé - 6/01/2026

Milestone
À l'examen
Approuvé
6 janvier 2026

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Autriche Énergie Eau, assainissement