Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20220666
Date de publication: 21 novembre 2025

Promoteur – Intermédiaire Financier

SCATEC ASA

Lieu

Description

The project entails the development, implementation and operation of a 100 MW electrolysis plant in Egypt for the production of hydrogen. The produced hydrogen will be used in an ammonia production plant in Ain Sokhna.

Objectifs

The aim is to produce Renewable Fuel of Non-Biological Orgin (RFNBO) for the European market and in accordance with EU requirements. In addition, the project intends to decarbonise ammonia production in Egypt by utilising renewable hydrogen as a feedstock instead of grey hydrogen, supporting Egypt's Nationally Determined Contributions (NDC) commitments. The project also intends to contribute to Egypt's National Low Carbon Hydrogen Strategy, which aims to position Egypt as a global renewable hydrogen hub. The project is in line with the EU-Egypt Strategic and Comprehensive Partnership and the priorities outlined in the Multi-annual cooperation program (2021-2027) between EU and Egypt.

Secteur(s)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

not disclosed

Coût total (montant approximatif)

not disclosed

Aspects environnementaux

The related impacts will have to be assessed by the relevant environmental studies for compatibility with the EIB's environmental and social standards. The local authority has already issued the environmental permit for the electrolyser.

Passation des marchés

The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The project seems to be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC and 2014/25/EU, hence private sector procurement procedures will apply.

Statut

Approuvé - 10/12/2025

Milestone
À l'examen
Approuvé
10 décembre 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Égypte Industrie